Hollin Lane, roadworks in Middleton from 7 July 2025

Area
Rochdale
Expected start and finish

8am, Monday, 7 July 2025–5pm, Monday, 21 July 2025

Reason
To repair damaged drainage gullies in the road.
Restriction and location

Hollin Lane: parts of the cycle lanes will be temporarily suspended.

  • The west side: from a point 37 metres north of a point opposite the northerly kerb line of Hazelhurst Drive, to a point opposite the southerly kerb line of Oaken Bank Road.
  • The east side: from a point 42 metres north of a point opposite the north of the junction with Hazelhurst Drive to the junction with Oaken Bank Road.
Organised by
Rochdale Borough Council