- Area
- Expected start and finish
-
8am, Monday, 7 July 2025–5pm, Monday, 21 July 2025
- Reason
- To repair damaged drainage gullies in the road.
- Restriction and location
-
Hollin Lane: parts of the cycle lanes will be temporarily suspended.
- The west side: from a point 37 metres north of a point opposite the northerly kerb line of Hazelhurst Drive, to a point opposite the southerly kerb line of Oaken Bank Road.
- The east side: from a point 42 metres north of a point opposite the north of the junction with Hazelhurst Drive to the junction with Oaken Bank Road.
- Organised by
- Rochdale Borough Council
- Directions
- View roadworks on a map