Boo Hole landfill site
The former Boo Hole landfill site was designated as contaminated
land in April 2009. Although there was evidence of gas migrating
from the site, investigations did not identify the presence of gas
inside properties bordering the site where monitoring had been
undertaken.
Background
Boo Hole is located in Heywood between Bury New Road and Bury
Old Road, situated approximately 1.5km east of the M66, junction
2.
Site History
The 1890’s historical maps record a “Sand Pit” in the vicinity
of the present day Boo Hole Farm in the northwest corner of the
map. This sand pit was subsequently expanded up until the 1960’s.
Sometime after this the site became a landfill for domestic and
commercial wastes, tipping continued until the 1990’s when the site
was closed and landscaped.
Action taken
We were alerted the landfill was producing gas in 2002. Landfill
gas is produced from the natural breakdown of the infilled
material, in this case, wood, paper and other wastes and comprises
a number of gases, chiefly methane and carbon dioxide. We then
commissioned consultants to undertake investigations.
The investigations
The investigations involved:
- A record search over the type of wastes that went into the
site
- Installing boreholes so the ground gases could be
monitored
- Taking soil samples to analyse for contamination
- Risk assessments to assess the level of risk
The investigation concluded there was no risk to site users.
Reports completed for the investigations
| Date |
Type of work |
Report |
Done by |
Reference |
| April 2009 |
Gas Assessment |
Letter Report |
Mouchel |
|
| February 2009 |
Gas Assessment |
Letter Report |
Mouchel |
|
| October 2008 |
Bulk Gas Sampling |
Letter Report |
Mouchel |
Ref 721495/06/01 |
| February 2008 |
Detailed Inspection |
Interpretative Environmental Report |
Mouchel |
Ref 721495/R/2A |
| December 2007 |
Ground Investigation |
Factual Report |
Mouchel |
Ref 721495/06/01 |
| December 2005 |
Landfill Gas Assessment |
|
Greater Manchester Geological Unit |
Ref 4992 |
| January 2005 |
Geoenvironmental Investigation |
|
Leyden Kirby Associates Ltd |
Ref CL-602-JB186-01 |
| August 2009 |
Remediation Options Appraisal |
Boohole Landfill site |
Rochdale Environmental Protection Group |
|
| January 2010 |
Geophysics and topographic survey |
Letter, report and plan |
Bentham Geoconsulting and Powers Tillman |
BGC33 for geophysics |
| January 2010 |
Remediation proposals |
Gas Protection Measures: Boo Hole Landfill Site |
Vertase FLI |
Rev A 2606 |
|
June 2010
|
Remediation Method Statement |
Boo Hole Landfill Site |
Vertase FL1 |
Rev A 1131 |
|
June 2011
|
Completion Report |
Boo Hole Landfill Site |
Vertase FL1 |
Rev 1131 |

Work following determination
- Our application to DEFRA for funding to undertake the
remediation works at Boo Hole was successful and the works have now
been completed.
- A monitoring period has been completed that has demonstrated
the barrier is working as expected.
- The contaminated land register has now been altered to show the
former Boo Hole Landfill has now been remediated.